---
title: "Move a team from Jira"
canonical_url: https://zentrik.ai/docs/product/move-from-jira
markdown_url: https://zentrik.ai/docs/product/move-from-jira.md
category: "Product guides"
learning_track: "move-to-zentrik"
last_reviewed: 2026-11-10
---

# Move a team from Jira

Bring one Jira project into a Zentrik team with its issues, sprints, epics and full history. The import only reads Jira, so the team can keep Jira running while it switches.

## Overview

Move one team at a time. Each import brings one Jira project into one Zentrik team, and the team’s velocity, cycle time and throughput start from its real Jira dates.

## Before you start

1. Connect Jira from **Settings → Integrations → Jira**. See [Zentrik + Jira](https://zentrik.ai/docs/integrations/jira).
2. Match your people: open **Settings → Members → Sync with integrations** and choose Jira, so everyone’s work keeps its assignee. Work assigned to someone not matched arrives unassigned, and their comments keep their Jira name.
3. Choose the team. To keep Jira’s issue numbers, open the team’s menu, choose **Edit team**, set **Task key** to the project’s key, and import before the team has tasks.

## Bring the project across

1. Open **Settings → Teams**, choose the team, and pick **Bring work from Jira…** from its menu.
2. Find the Jira project and select it.
3. Choose **All** issues, or only the **Open** ones.
4. Read the review. It shows how many epics become initiatives, whether sprints become cycles, and whose work goes to which member. Use **Match people** for anyone not matched yet. If your plan has no room for more active initiatives, the review says which open epics arrive as tasks.
5. Point each Jira status at one of the team’s statuses. A status the team doesn’t have yet is added under Jira’s name.
6. Select **Import *N* issues**. The import runs in the background, so you can close the dialog.

## What comes across

- **Issues** become the team’s own tasks, with their descriptions, statuses, assignees, priorities, due dates, story points, labels, sub-tasks, links, comments, files and the full history of how they moved, dated as in Jira.
- **Epics** become initiatives, with their stories filed under them. An epic already linked to an initiative files its work there.
- **Sprints** become the team’s cycles. Closed sprints arrive completed, future ones planned, and the active one running. Unfinished work from closed sprints waits in the backlog, as it does on Jira’s board.
- **Components and fix versions** become labels. A version number such as 2.4 reads “Release 2.4”.
- **Other Jira fields** you filled in stay on each task under **Provenance**, read-only, beside the link to the issue in Jira.
- **Issue keys** stay the same when the team’s key matches the project’s key and the team had no tasks. Otherwise tasks take the team’s numbers, and their Jira keys still open them, in links and in branch names.
- **Won’t Do and Duplicate** work arrives canceled, so it never counts as delivered.

Files up to 50 MB are copied into Zentrik; larger ones stay in Jira. No one is notified about the past.

## Keep Jira running while you switch

The import only reads Jira and never changes your issues, so Jira stays exactly as it was.

Turn on **Keep following Jira** in the review, and Zentrik catches up each morning on its own. It brings new issues, comments, links and files, moves cycles forward as Jira closes sprints, and takes Jira’s edits to tasks your team hasn’t changed in Zentrik. Once your team changes a task here, the task is the team’s, and Jira’s later edits leave it alone. The review shows when Zentrik last checked, what came across and when it checks next. Following is part of plans that include scheduled imports.

To catch up straight away, run the import again from the same menu. It brings only what changed.

A team that keeps working in Jira can show its sprints in Zentrik instead. Turn on **Settings → Integrations → Jira → Sprints as cycles** and choose the team’s board. Zentrik refreshes the sprints every 15 minutes, and their tasks stay read-only here with a link to Jira. Each team uses one or the other: a team whose sprints sync from Jira or Linear can’t also take an import.

## Send stories and tasks to Jira

Teams that still build in Jira can take work from Zentrik. On an initiative’s **Tasks**, open **More task actions** and choose **Sync to Jira…**. On its **Stories**, choose **Sync stories**. Pick the Jira project, issue type and parent issue, then map the fields. Zentrik creates or updates the issues and keeps each one linked to its initiative.

## What stays in Jira for now

- **Releases.** Fix versions arrive as labels; release dates and version planning stay in Jira.
- **Levels above Epic.** They arrive as initiatives of their own, side by side; the nesting between them stays in Jira.
- **Okta sign-in.** Sign-in through Okta isn’t available yet. Your team signs in with email and password or Google.

## Troubleshooting

### The team’s menu has no Bring work from Jira…

Connect Jira first. The item appears for workspace owners and admins, and for the team’s admins.

### The import refuses the team

The team’s sprints or cycles already sync from Jira or Linear. Import into a team that doesn’t sync.

## Related guides

- [Move from Jira Product Discovery](https://zentrik.ai/docs/product/move-from-jira-product-discovery)
- [Move from Aha!](https://zentrik.ai/docs/product/move-from-aha)
- [Prepare documents and delivery work](https://zentrik.ai/docs/product/documents-and-delivery)
